In the Tanzanian seaside city, Zanzibar,our team is gearing up to the “Tanzania ZNZ Project,” which marks our fourth collaboration with our partners on a resort project. This journey has been filled with collaboration and innovation, and we are excited to continue our partnership.We have built a strong reputation for delivering high-quality kitchen solutions tailored to the unique needs of each resort.Our goal is to ensure that the resort runs smoothly from day one, providing an exceptional experience for every guest.

Cold Room Installation & Equipment Arrangement and Assembly Completion

In our previous projects, we successfully provided kitchen design and one-stop kitchen equipment procurement services for multiple resorts. This is not just a simple service provision, but a testament to the deep trust we have built with our clients. We have built a strong reputation for delivering high-quality kitchen solutions tailored to the unique needs of each resort.

ProjectStaff Kitchen Completion Overview

The originally estimated installation time for the project was 50 days. However, through the collective effort of the entire team, we completed it in just 25 days. All key deliverables were successfully met, and all requirements were satisfied and accepted. The project was completed on time, within budget, and according to quality standards.

Tanzania ZNZ Project Installation

The entire installation team took a group photo with the project stakeholders at the end of the project.

ProjectPreparation of our Professional Team

To ensure the success of the project, a dedicated team of experienced engineers and technicians were dispatched for the 50-day installation.We are sending two of our most experienced technicians, Bing and Daniel, who come with a wealth of engineering and installation experience. Their expertise is crucial for the successful execution of this project. Although most of the members had worked on international projects before, the Tanzanian culture and climate were new challenges for us.

Day5 -Project Overview & Cold Room Installation

Before their departure to Tanzania, Bing and Daniel underwent a comprehensive one-month training program. This intensive training not only refreshed their technical skills but also focused on project-specific requirements, safety protocols, and effective installation practices. The objective was to ensure they are well-prepared to address any challenges that may arise on-site.In addition to this training, they meticulously prepared all necessary installation materials to ensure a streamlined process upon arrival. This preparation included verifying that the correct equipment and tools were available and in good condition, as well as ensuring that all installation materials met our high-quality standards. Being proactive in their preparation is a testament to their professionalism and commitment to excellence.

ProjectChallenges and Solutions during Installation

From conceptual design to equipment procurement, and finally to installation and commissioning, all our efforts will culminate in a wonderful experience.

Day4 -Fish Local Catch and Seafood Preparation Area Installation

Moreover, both technicians engaged in scenario-based training sessions, where they simulated potential on-site situations that might pose challenges. This proactive approach empowers them to respond swiftly and efficiently to unforeseen circumstances, minimizing downtime and ensuring that the installation process remains on track. Their readiness is vital not only for the technical aspects of the job but also for fostering a collaborative environment with the local team in Tanzania.

On-Site Discussion of Exhaust Hood Layout Details for the Second Main Kitchen with Project Manager

Realistic challenges ensued as we set foot in this vibrant land. The hot climate and complex terrain made installation difficult. However, through teamwork and innovation, we overcame one technical challenge after another and established a good working relationship with the local staff.

Day9 -Staff Kitchen Installation

ProjectProject Update

We are excited to witness the transformation of this space into a vibrant haven for travelers and locals alike.Together, we are not just building a resort; we are creating unforgettable memories for everyone who walks through its doors.

Day10 -Staff Kitchen Installation Updaged

Day11-Staff Kitchen Installation Updated

ProjectKitchen Project & Coldroom Completion Feedback

Cold Room

Food Preparation Area

Buffet equipment testing

Adjustment